Find Me On...

Art Zemon

art@zemon.name

  • Home
  • Browse
  • Search
  1. Aviation
  2. Bede BD-4C

Rudder

Read More
6 rudder pieces: VS-17 front spar, right side skin, tailing edge doubler, left side skin, and two of the three ribs.
1 / 9

6 rudder pieces: VS-17 front spar, right side skin, tailing edge doubler, left side skin, and two of the three ribs.

2011

  • 6 rudder pieces: VS-17 front spar, right side skin, tailing edge doubler, left side skin, and two of the three ribs.
  • The spar and two of the ribs sitting in position on the right side skin. The leading edge of the rudder is on the left, the trailing edge on the right.
  • The left side skin (top) clamped to the top of the spar. You can see the doubler between the trailing edges.
  • The trailing edges are clamped together and the VS-9 bottom rib inserted into position
  • Two versions of the VS-9 bottom rib. The original (on top) is too large for the new rudder. The new VS-9 is underneath.
  • My three ribs, VS-15, VS-10, and VS-9.
  • All three ribs in place in the rudder.
  • VS-15 rib in top of rudder
  • Template for VS-16 spacer taped on top of the rudder and the VS-15 rib, to confirm that the rib is long enough.
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2022 SmugMug, Inc.