Find Me On...

Art Zemon

art@zemon.name

  • Home
  • Browse
  • Search
  1. Aviation
  2. Bede BD-4C

Floor

Installing the floor in the Bede BD-4C
Read More
Rivet holes drilled in bracket across the front of the cabin. The nose gear attaches to this bracket. The rudder pedals and control sticks will also attach to it.
4 / 10

Rivet holes drilled in bracket across the front of the cabin. The nose gear attaches to this bracket. The rudder pedals and control sticks will also attach to it.

2011

  • Sheet metal for floor in fuselage
  • Rivet holes drilled through the gear box and floor
  • Rivet holes drilled around the periphery of the floor. Ready to drill the bracket at the front of the cabin area.
  • Rivet holes drilled in bracket across the front of the cabin. The nose gear attaches to this bracket. The rudder pedals and control sticks will also attach to it.
  • All of the holes drilled. Ready for dimpling and countersinking.
  • Dimpling the floor for the countersunk rivets
  • All prep work done. Ready to install.
  • Close up of the back side of dimpled holes. The rivet gets inserted into the other side.
  • Countersunk holes in a bracket. The dimples in the floor fit into these countersunk holes.
  • Floor riveted into the Bede BD-4C fuselage
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2022 SmugMug, Inc.