Find Me On...

Art Zemon

art@zemon.name

  • Home
  • Browse
  • Search
  1. Aviation
  2. Bede BD-4C

Floor

Installing the floor in the Bede BD-4C
Read More
Sheet metal for floor in fuselage
1 / 10

Sheet metal for floor in fuselage

2011

  • Sheet metal for floor in fuselage
  • Rivet holes drilled through the gear box and floor
  • Rivet holes drilled around the periphery of the floor. Ready to drill the bracket at the front of the cabin area.
  • Rivet holes drilled in bracket across the front of the cabin. The nose gear attaches to this bracket. The rudder pedals and control sticks will also attach to it.
  • All of the holes drilled. Ready for dimpling and countersinking.
  • Dimpling the floor for the countersunk rivets
  • All prep work done. Ready to install.
  • Close up of the back side of dimpled holes. The rivet gets inserted into the other side.
  • Countersunk holes in a bracket. The dimples in the floor fit into these countersunk holes.
  • Floor riveted into the Bede BD-4C fuselage
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.